Large-Scale Municipal Solar Array Ribbon Cuttingq
A public ribbon cutting and tour are scheduled at the site of the second largest solar array in New Hampshire. The 651-kilowatt Oyster River Forest Solar Array is the largest project to date for the installer, New England-based ReVision Energy. IGS Solar, the array owner. The Town of Durham owns the site. The array generates 100% of Durham’s municipal electric load, with the exception of the waste water treatment plant. Power in excess of the town’s needs supplies some of the electric load for the Oyster River Cooperative School District.
Date and Time
Thursday Jul 21, 2016
10:00 AM - 11:00 AM EDT
July 21 at 10am
Location
411 Packers Falls Road in Lee, NH, near intersection of Jenkins Road.
Fees/Admission
None
Website
Contact Information
Christina
Send Email